To shorten a rope whose ends are both made fast without cutting it, and to be able to release it at once by pulling out the toggles.
When
Unknown; no date appears in the sources. Hasluck described it in 1907; according to Wikipedia the sheepshank itself has been known since 1627.
Who devised it
Unknown.
Where the name comes from
Hasluck calls it the 'boat-knot shortening': the ends are pinned with a toggle the way the boat knot is.
Its story
The toggled sheepshank is a sheepshank, the shortening that takes up a rope without cutting it, with its ends held by toggles. Hasluck described it in 1907 as the 'boat-knot shortening': at each end a portion of the slack rope is drawn through the bight and pinned there with a belaying pin or a bit of wood, the same way the boat knot is held; it is easy to loosen and can be tied while both ends of the rope are made fast. Verrill drew it in 1917 as a sheepshank meant to be released instantly by pulling the toggles out, and Dana and Pearl wrote in 1921 that the toggles make it as secure as their 'three-fold shortening' while it stays easy to untie. According to Wikipedia the sheepshank itself dates back to 1627 and is unstable, spilling when it carries too little or too much load.