Hitch
Lobster buoy hitch
A hitch for a buoy or ring that does not shake loose.
How to tie it
- Take the working end OVER the post (or ring), bring it back BEHIND (under) it and down on the left of the standing part.
- First half hitch: take the end across OVER the standing part, then lower down back UNDER it.
- Lead the end up the left side towards the ring.
- Make the second half hitch the OPPOSITE way, close to the ring: take the end OVER its own leg and UNDER the standing part.
- Bring the end down from the right: OVER the standing part and the first diagonal, then out UNDER the strand on the left.
- Push the knot up to the ring and pull the standing part: two opposite half hitches (a cow hitch) on the standing part work towards the ring.
The method was checked against: Wikipedia: Lobster buoy hitch, Knotspedia: Lobster Buoy Hitch.
No sourced Turkish name yet.
- Where not to use it
- In temporary work that must be undone.
- Weakness
- Can jam.
Similar and alternative knots
Sources and verification
- Wikipedia: Lobster buoy hitch
- Wikidata: Q6663859
- The tying steps were played in the rope engine to produce the checking signature; the comparison with two independent sources is in docs/pilot-baglar.md.