Hitch
Anchor bend (fisherman's bend)
Turkish: Demir bağı
Ties a rope to an anchor ring or shackle; the first half hitch passes through the round turn.
How to tie it
- Take the end OVER the ring (post) and back UNDER it, then once more the same way: a round turn.
- Take the end OVER the standing part and up its other side, round behind it.
- Pass the end UNDER both turns, between them and the ring: UNDER the standing part, then OVER, UNDER, OVER the legs of the turns.
- Second half hitch: lower down, take the end OVER the standing part and back UNDER it.
- Bring the end down through the gap, OVER its own part.
- Snug the turns onto the ring and pull the standing part; for a permanent mooring seize the end to the standing part.
The method was checked against: Animated Knots: Anchor Hitch, Wikipedia: Anchor bend, MEB MEGEP, Gemici Bağları modülü (2014), s. 18, Şekil 3.2.
Turkish names, by who uses them
- General use: Demir bağı
Main Turkish name from general use · TÜBİTAK Bilim Çocuk
Sources for the names
- Where not to use it
- Where it must be untied often; it jams.
- Weakness
- Hard to untie once wet; seizing the end is recommended.
Similar and alternative knots
Sources and verification
- Wikipedia: Anchor bend
- Wikidata: Q2141190
- The tying steps were played in the rope engine to produce the checking signature; the comparison with two independent sources is in docs/pilot-baglar.md.