Killick hitch TR

Hitch

Killick hitch

Turkish: Voltalı dülger bağı

Adds a half hitch to the timber hitch so a long object can be towed from its end.

Easy No ABoK number Loads and everyday jobsSailing and boating

How to tie it

  1. A half hitch near the end you will pull from: take the end OVER the object (post), back UNDER it, and across OVER the standing part.
  2. Lead the rope along the object to another place on it.
  3. For the timber hitch, take the end OVER the object, back UNDER it and down.
  4. Take the end OVER the part coming from the half hitch, then around UNDER it and back.
  5. Take the end up OVER its own part: the twists go on this leg.
  6. Keep twisting the end round that leg the same way: UNDER, OVER, UNDER, OVER.
  7. Pass the end UNDER the leg one last time and lead it out.
  8. Pull the standing part to grip the twists and then the half hitch on the object; the half hitch keeps the pull lined up with it.

The method was checked against: Animated Knots: Timber Hitch (killick hitch), Wikipedia: Timber hitch (Ashley alıntısı), Wikipedia: Killick hitch.

Turkish names, by who uses them

  • Scouts: Voltalı dülger bağı

Main Turkish name from scouts · Sakarya İzcileri

Sources for the names
Where not to use it
On short objects.
Weakness
If the half hitch sits in the wrong place the object rotates.

Similar and alternative knots

Sources and verification